Difference between revisions of "IB Computer Science 2"

From WLCS
Line 1: Line 1:
== Wednesday (1/7/15) ==
+
== Friday - Monday (1/9/15 - 1/12/15) ==
 
'''Agenda:'''
 
'''Agenda:'''
* Quiz on Operating Systems on Thursday, Friday (1/8-9/15)
+
* Operating Systems Quiz
* Introduction to Networks
+
* Finish [[Media:NetworkFundamentals.pptx]]
** [[Media:NetworkFundamentals.pptx]]
+
* More Networking
 +
** [[Media:DataTransmission.pptx]]
 +
** [[Media:WirelessNetworking.pptx]]
 
* Quick Assignment
 
* Quick Assignment
 
*# In class or at home, sketch a diagram of your home network
 
*# In class or at home, sketch a diagram of your home network
Line 12: Line 14:
 
*# Label each of the components
 
*# Label each of the components
 
*# Use solid lines for wired connections and dashed lines for wireless connections
 
*# Use solid lines for wired connections and dashed lines for wireless connections
 +
 +
== Wednesday - Thursday (1/7/15 - 1/8/15) ==
 +
'''Agenda:'''
 +
* Quiz on Operating Systems on Friday, Monday (1/9/15, 1/12/15)
 +
* Introduction to Networks
 +
** [[Media:NetworkFundamentals.pptx]]
  
 
== Monday (1/5/15) ==
 
== Monday (1/5/15) ==

Revision as of 09:45, 9 January 2015

Friday - Monday (1/9/15 - 1/12/15)

Agenda:

  • Operating Systems Quiz
  • Finish Media:NetworkFundamentals.pptx
  • More Networking
  • Quick Assignment
    1. In class or at home, sketch a diagram of your home network
    2. Use http://www.draw.io
    3. Go to "More shapes..." in the lower left, and then click Cisco
    4. Include any/all devices that connect to your home network (e.g. desktops, laptops, printers, phones, tablets, TVs)
    5. Include any routers or switches
    6. Label each of the components
    7. Use solid lines for wired connections and dashed lines for wireless connections

Wednesday - Thursday (1/7/15 - 1/8/15)

Agenda:

Monday (1/5/15)

Warmup:

  • List the stages of the machine's fetch-execute cycle
  • Turn in Criteria A through C (hardcopy, stapled, etc.)

Agenda:

  • Introduction to Operating Systems
  • Turn in Criteria A through C (hardcopy, stapled, etc.)

Wednesday - Friday (12/24/14 - 1/2/15)

  • Winter Break

Monday - Tuesday (12/22/14 - 12/23/14)

Agenda:

  • Personal Finance
  • Work on Internal Assessment
    • Project must be completed before Criteria C can be done
    • Criteria A-C due by the end of Winter Break

Friday - Friday (12/15/14 - 12/19/14)

Agenda:

  • Work on Internal Assessment
    • Project must be completed before Criteria C can be done
    • Criteria A-C due by the end of Winter Break

Friday - Friday (12/5/14 - 12/12/14)

Agenda:

  • Work on Internal Assessment
    • Project must be completed before Criteria C can be done
    • Criteria A-C due by the end of Winter Break
  • NVCC Dual Enrollment
    1. Complete the NVCC admission application (obtain your NVCC student ID #)
    2. Complete the NVCC Student ID# Survey
    3. Write your name and NVCC student ID# on the placement sheet
    4. Circle and write your scores that place you out of the COMPASS exam
    5. Find and print out the documentation/evidence that shows your score that places you out of the COMPASS exam
      • Examples: PSAT scores, SAT scores, SOL scores (go to counseling for a print out)

Wednesday - Thursday (12/3/14 - 12/4/14)

Agenda:

Monday - Tuesday (12/1/14 - 12/2/14)

Agenda:

Archives